Difference between revisions of "HIP"

From Earlham CS Department
Jump to navigation Jump to search
m (Current Projects)
(Current Projects)
 
(16 intermediate revisions by the same user not shown)
Line 1: Line 1:
Hardware Interface Project (HIP) is a Computer Science Applied Group. We work closely with the Green Science Applied Group. All Applied Groups are interdisciplinary by nature, and so we might have students from other majors.  
+
Hardware Interface Project (HIP) is a Computer Science Applied Group. We work closely with the Green Science Applied Group. All Applied Groups are interdisciplinary by nature, and so we might have students from other majors.
  
 
== Introduction ==
 
== Introduction ==
Line 5: Line 5:
 
* [[New Member Orientation]]
 
* [[New Member Orientation]]
 
* [[Members]]
 
* [[Members]]
 +
* [[Man|Manuals]]
  
== Current Projects ==
+
==Current Projects==
 +
* [[Building monitoring|Energy monitoring]] (including fixing IP numbers for new network configuration)
 
* [[eDisplay]]
 
* [[eDisplay]]
** [[eDisplay Code]] - software source control
 
** [[Desktop Board For Display|Desktop Board]] - being repaired - GC,XF,CE
 
 
* [[Weather Station]]
 
* [[Weather Station]]
* Remote sensing and reporting platform
+
* [[Proto Backup]]
** water level - GY
+
* [[Solar Array]]
 +
* [[Wind Turbine]]
 +
* [[House Demo]]
 +
 
 +
== Less Current Projects ==
 +
* [[Nicaragua Weather Stations]]
 +
* [[Hazard Platform]]
 
* [[Proto Upgrade]]
 
* [[Proto Upgrade]]
 
* [[Webcam|Webcam filming Phase 2 construction]]
 
* [[Webcam|Webcam filming Phase 2 construction]]
Line 19: Line 25:
 
** [[Joseph Moore Museum Air Monitoring|Joseph Moore Museum]]
 
** [[Joseph Moore Museum Air Monitoring|Joseph Moore Museum]]
 
** New building
 
** New building
* Energy monitoring
+
* [[Mosquitto]]
** Contact Daryl about Siemans (Tyler, Stanley, New Science)
 
** [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
 
** Central Switch - IB, CP, GC
 
** EH - (good luck)
 
** AWC - GC - (GC, 10-16-14, needs hooked up)
 
** Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
 
** Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
 
** New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
 
 
* Earthquake detection - AG, GC
 
* Earthquake detection - AG, GC
 
* [[Energy Wars Display|Energy Wars setup]] - GC
 
* [[Energy Wars Display|Energy Wars setup]] - GC
 
* [https://github.com/EarlhamCS EarlhamCS GitHub]
 
* [https://github.com/EarlhamCS EarlhamCS GitHub]
 
== Unfinished/Possible Projects ==
 
'''Unfinished'''
 
* Normalization - AG & AS
 
* New contemporary web - AS
 
* Installing earthquake sensor - AS
 
'''Possible'''
 
* Bike share
 
* Energy Wars website
 
* Demo box
 
* H2O and LPG
 
* Laundry monitoring
 
  
 
== Established Projects ==
 
== Established Projects ==

Latest revision as of 13:36, 9 November 2016

Hardware Interface Project (HIP) is a Computer Science Applied Group. We work closely with the Green Science Applied Group. All Applied Groups are interdisciplinary by nature, and so we might have students from other majors.

Introduction

Current Projects

Less Current Projects

Established Projects

Green Science - http://wiki.cs.earlham.edu/index.php/Green_Science

Displays & Energy monitoring

Energy Auditing

LittleFe

Power Production

Field Science

Publications

Weather Station

Misc

Other

Archived Notes / To Do Lists

Fall 2012
Spring 2012
Fall 2011
Spring 2011
Summer 2010
Spring 2010
October 2009
Winter 2009
2006

Unsorted Content

  • INVENTORY
  • For zoey, see inventory for list of items in the kit
  • Also see inventory for TIC and see manuals for directions on how to use it

Other local data that can easily be harvested: Farmland