|
|
| Line 1: |
Line 1: |
| The Keck Foundation Phase I proposal:
| | [[keck-phase-1|Keck Foundation Phase I Proposal]] (mostly archival in nature, good reference) |
| *[[keck-phase-1-summary|Phase 1 prose, summary sections (1-5)]] (one page maximum)
| |
| *[[keck-phase-1-description|Phase 1 prose, description sections (6-12)]] (two pages maximum)
| |
| *[[keck-phase-1-reviewers|Phase 1 reviewers]]
| |
| *[[Image:keck-budget-1.xls||Phase 1 budget spreadsheet, revised]] (The current one)
| |
| **[[Image:keck-budget.xls||Phase 1 budget spreadsheet]] (The old one)
| |
| **[[keck-phase-1-budget|Phase 1 budget]] (The really old one)
| |
|
| |
|
| *Things to do:
| | [[keck-phase-2|Keck Foundation Phase II Proposal]] |
| **Review Doug's call notes with Mercedes. 07-Mar-2006 email from Barbara.
| |
| **Check with potential reviewers
| |
| **Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (links above). Using two browser tabs, one with each of the documents in edit mode, is one way to do this.
| |
| **Review the Keck guidelines. 07-Apr-2006 email from Barbara.
| |
| **Develop the budget. 07-Apr-2006 email from Barbara.
| |
|
| |
| *Open questions:
| |
| **What counts as a matching contribution from EC? E.g. indirect, graphite furnace (Barbara)
| |
|
| |
|
| *Timetable:
| | [[Media:Summer_letter_06.doc]] Summer research cover letter 2006 |
| **22-May-2006 - Phase I proposal due to DougB
| |
| **01-Aug-2006 - Notification from Keck, begin work on full proposal?
| |
| **01-Sep-2006 - Full prosposal due to Keck
| |
| **01-Dec-2006 - Notification from Keck
| |
|
| |
|
| Documents from the Keck Foundation letter of inquiry (LOI):
| | [[Media:summer_research_06.xls]] Summer research spreadsheet 2006 |
| *[[Keck Foundation LOI|LOI prose]]
| |
| *[[Keck Foundation LOI Notes|LOI notes]]
| |
| *[[Keck Foundation Proposal|Keck Foundation proposal outline (memo to Doug)]]
| |
| | |
| *[[Media:Summer_letter_06.doc]] Summer research cover letter 2006
| |
| *[[Media:summer_research_06.xls]] Summer research spreadsheet 2006
| |
|
| |
|
| Meeting minutes: | | Meeting minutes: |
Keck Foundation Phase I Proposal (mostly archival in nature, good reference)
Keck Foundation Phase II Proposal
Media:Summer_letter_06.doc Summer research cover letter 2006
Media:summer_research_06.xls Summer research spreadsheet 2006
Meeting minutes: