List of tasks needs to be done
Jump to navigation
Jump to search
Contents
- 1 SC12 Week
- 2 Thanks Giving Break Week
- 2.1 Readings --> (done)
- 2.2 Create Makefile -->(done)
- 2.3 Fix environment (world - my_swarm.world) file -->(done)
- 2.4 Fix the Configuration (my_swarm.cfg) file -->(done)
- 2.5 Test simulation:
- 2.6 Project Documentation -->(Done 70%)
- 2.7 Final Paper
- 2.8 Working on the first draft of final paper
- 2.9 Class Presentation:
- 3 Week of Nov 26
- 4 Week of Dec 2
SC12 Week
2 hours: Add function for wireless network communication to the my_swarm.cc file
1 hour: Fix the obstacle avoidance function
1 hour: simulation testing
Thanks Giving Break Week
Readings --> (done)
- Monday 1-2hour: Read the User Manual for the latest version of Player/Stage
- Monday 1 hour: Paper "The Player/Stage Project: Tools for Multi-Robot and Distributed Sensor Systems" by the player/stage developers
- Monday 1 hour: review online manual for writing player stage controller
Create Makefile -->(done)
- Tuesday 30 minutes: write a Makefile for the controller using example from the User Manual
Fix environment (world - my_swarm.world) file -->(done)
- Tuesday 2-3 hours: Increase the number of swarm in the .world file. This take while sometime because of adjusting the position of the robot. It will be cool to write control function to randomly spread the robots in the defined area.
- Tuesday 1 hour: Decrease the size of the robots to make it easy for increased swarm to search for target and avoid obstacle collision (done)
Fix the Configuration (my_swarm.cfg) file -->(done)
- Tuesday 1 hour: Add drivers for instantiating new robots added to the .world file
- Tuesday 1 hour: Config their Navigational and obstacle avoidance drivers
Test simulation:
- Wednesday 20 minutes: Test robot behavior and environment
- Wednesday 10 minutes: robot obstacle avoidance
- Wednesday 20 minutes: communication
- Wednesday 30 minutes: Planes for what needed to be work on Next week related to software
Project Documentation -->(Done 70%)
- Wednesday 2-3 hours: Edit the Documentation for the project
- - Player server overview
- - Stage simulator overview
- - Player/Stage (.world) (.cfg) (.inc)
- - Control files
Final Paper
- Wednesday 1-2 hour: work on the final paper
- Wednesday 1 hour: Worked on Latex configurations for the paper
Working on the first draft of final paper
- Thursday 3 hours: Re-reviewing literature studied over the course of semester
- Friday 3-4 hours: Writing introduction, and literature review.
- Friday 1-2 hours: Software description
- Saturday 2 hours: backward reading the so far written first draft
- Saturday 1-2 hours: making necessary changes based on the backward reading
Class Presentation:
- Sunday 1: Create Slides for class presentation
- Sunday 1: Practicing Presentation
- Sunday 1: Preparing for Monday 11:30AM Meeting with Charlie
Week of Nov 26
Final Paper
- Monday 1 hour: Take the draft to writing center
- Monday 1-2 hours: make necessary changes
- Monday 1 hour: Add function to passing arguments at run time.-->(Done)
Class Presentation
- Tuesday 1 hour: Correct slides and Practice for Class presentation
- Tuesday 30 minutes: Practice demo of software
- 1-2 hour: work on missing homework
- Tuesday 30 Minutes: Fix the automation function add new arguments for host (ip) and port
Week of Dec 2
Final Paper outline
- Abstract -->(Done)
- Sunday 1-2 hours: Table of Content
- Introduction -->(90% Done) -- Monday 1-2 hours work needed to get done
- Problem Statment --> (Done)
- Literature Review -->(60% Done)- Sunday 2-3 hours: work needed to atleast get close to be done.
- Software Simulation Discustion-->(80% Done) -- Sunday 1-2 hours: work needed to get done.
- Monday 2-4 hours: Algorithm Discustion
- Sunday 1-2hours: Conclusion
- Monday 1-2hours: Future Work