Fall 2012
Jump to navigation
Jump to search
Projects:
Lilly Library TV Mount
Building monitoring
- eDisplay v2
- Use source control
- Fix recent introduced crashing
- Split, total and all other buildings in to 2 separate charts - one above other (Since we have a larger screen now)
- Data normalization
- Merge CS Wikis
- Done. All information from cluster wiki and wiki.cs.earlham.edu is now on wiki.cs.earlham.edu.
- Energy Wars 2012 Prep.
Notes from the 2 February 2012 meeting:
- Blower door training was done for 3 groups, nice work gang.
- Darken the axis labels on the energy display (Gustavo, Tristan)
- Develop a small weather display, integrate into energy display, send to Content folks (Gustavo, Tristan)
- Prepare for electrical consumption data from multiple buildings (Gustavo, Tristan)
- Re-consider the locations and types of screens to use for the eDisplays, next lunch meeting (All)
- Screen savers on all the ECS lab machines (Ben to speak with Tom Steffes)
- Lilly Library
- Earlham Hall
- Carpenter
- Runyon
- Consider iPads for Admissions and the President's office lounge area
- For larger units consider an automagic rotating display rather than a remote control
- Degree day calculations based on Dick Smith's email (Corey)
- Weather data to Postgres (Ivan, Sotheary
- Solar array power production to Postgres (Tristan, Sotheary)
- SEPAM addressing (Ivan, Mikel, Ben)
- Button-up solar array wiring (Ben, Alex)
- Weather station installation fixup (Ivan, Sotheary, Corey)