Difference between revisions of "Sysadmin"

From Earlham CS Department
Jump to navigation Jump to search
(Current Projects (updated 2017-09-14))
(Current Projects (updated 2017-10-26))
Line 362: Line 362:
 
** update misc software on those machines (locally!)
 
** update misc software on those machines (locally!)
 
* Strike unused lovelace machine addresses from CS DNS file
 
* Strike unused lovelace machine addresses from CS DNS file
 +
** Perhaps there's a python file in root's home somewhere that checks for unused DNS/DHCP addresses?
  
 
== Ongoing Projects (Spring 2017) ==  
 
== Ongoing Projects (Spring 2017) ==  

Revision as of 11:37, 26 October 2017


Machines and Brief Descriptions of Services

CS Machines

Server layout as of May 2017
HOME
(vm0)
Users
SSH
NFS
NET
(vm1)
LDAP server
DNS
DHCP
WEB
(vm2)
Mailman
Mail Stack
Apache2
PostgresQL
MySQL
Wiki
TOOLS
(vm3)
SageNB Server
Jupyterhub Server
Software Modules
NginX
BABBAGE
Firewall
PROTO
Weather Monitoring
GPS/NTP
Energy Monitoring
CONTROL
Users
SSH
HOME
TOOLS
SMILEY
Sysadmin:XenDocs
NET
WEB
SHINKEN
Users
SSH
Add machines
MURPHY
Elderly email stack
Users
SSH













Cluster Machines

HOPPER
Users
SSH
NFS server
LDAP server
Software Modules
PostgreSQL
Wiki
Apache2
DNS
DHCP
DALI
Storage Server
Gitlab
Backups
NginX
AL-SALAM
WebMO
Software Modules
Apache2
LAYOUT
Jupyterhub Server
Software Modules
NginX
Apache2
WebMO
BRONTE
Software Modules
POLLOCK
Software Modules
WebMO
NginX
KAHLO
Storage Server
Backups
NginX
BIGFE
Software Modules
T-VOC
Software Modules
ELWOOD
Software Modules


























Switches

SG538SF02J
  • Model: HP Procurve 3400cl
  • Ports: 24
  • Backplane bandwidth:
    • 88 Gbps
    • 64 million pps
  • Memory:
    • 2MB packet buffer
    • 16 MB dual flash
    • 128 MB SDRAM
  • Cut-through switching: No
  • Unused as of May 12, 2017
CN63FP762S
  • Model: HP 2530-24G
  • Ports: 24
  • Switching Capacity:
    • 56 Gbps
    • 41.6 million pps
  • Memory:
    • 1.5 MB packet buffer
    • 256 MB flash
    • 128 MB DDR3 DIMM
  • Cut-through switching: No
  • Connected to Al-Salam as of May 12, 2017
SG525SG025
  • Model: HP Procurve 3400cl
  • Ports: 24
  • Backplane bandwidth:
    • 88 Gbps
    • 64 million pps
  • Memory:
    • 2MB packet buffer
    • 16 MB dual flash
    • 128 MB SDRAM
  • Cut-through switching: No
  • Connected to layout and whedon as of May 12, 2017
Netgear JGS524
  • Current cluster head-node
  • Unmanaged (no console/configuration)
  • Ports: 24
  • Switching bandwidth:
    • 48 Gbps
    • 1.5 million pps
  • Memory:
    • 2MB packet buffer
  • Cut-through switching: No
  • Connected to Al-Salam, Hopper, Pollock, Nagios, Dali, Kahlo, Bronte as of May 12, 2017
cs-main
  • Model: HP 5920AF-24XG
  • Ports: 24
  • Backplane bandwidth:
    • 480 Gbps
    • 367 million pps
  • Memory:
    • 3.6 GB packet buffer
    • 256 MB dual flash
    • 2 GB SDRAM
  • Cut-through switching: Yes
  • IP Address: 159.28.31.66
  • Connected to layout, kahlo, and dali as of May 12, 2017
5500denniscs-sw1
  • Model: HP 5500 JG542A
  • Ports: 24
  • Backplane bandwidth:
    • 224 Gbps
    • 166.6 million pps
  • Memory:
    • 6 MB packet buffer
    • 512 MB dual flash
    • 1 GB SDRAM
  • Cut-through switching: No
  • IP Address: 159.28.31.67
  • Connected to Babbage, Control, Nagios, and the cluster's netgear switch (via port 14) as of May 12, 2017

























Systems Administration Documentation

For old documentation, see: Old Wiki Information

Current Projects (updated 2017-10-26)

TODO

  • Finish migrating tools and home to smiley migrate web and net back to control
    • Record consistent & thorough documentation, especially concerning the startup and shutdown of the VMs
  • Setup graceful shutdown when we detect to be running solely off UPS
    • Additionally, setup clean shutdown and startup for VMs on smiley control (?)
  • Fix reverse lookup error for mail.cs.earlham.edu
    • Should consistently refer to 159.28.22.2 (web.cs.earlham.edu)
    • It's possible that this isn't actually broken.
  • Layout infiniband subnet manager
  • Layout disk swap, new lo0
    • Redo /scratch for mglerner group on /media/r10_vol ?
  • Migrate Elwood, BigFe, t-voc to repurposed Lovelace Machines (Eli)
  • HP Al-Salam switch enable jumboframes ?
  • Install Haskell & associated tools on Lovelace machines
    • Also document which 6 lovelace computers are currently set-up (e.g. l1, l2, etc)
    • update misc software on those machines (locally!)
  • Strike unused lovelace machine addresses from CS DNS file
    • Perhaps there's a python file in root's home somewhere that checks for unused DNS/DHCP addresses?

Ongoing Projects (Spring 2017)

TODO

  • EMAILING ALL THE USERS https://wiki.cs.earlham.edu/index.php/Sysadmin:Old:Contacting_All_Users
  • SHUTDOWN SCHEDULED FOR SUNDAY (APRIL 16)
  • Fix certs for gitlab, etc.
  • Secure 1-2 admins for the summer
  • Prep layout for May-June usage
  • Practice shutdown-startup procedure (with Michael)
  • Nsswitch consistency across all machines
  • Document tools: startup / shutdown - Charlie
  • Use Sysadmin namespace for all our pages - All
    • Testing usefulness of documentation - Dave
  • Al Salam: configure switch, re-rack. - Vitalii
    • HP switch should be reset and tested.
  • LDAP cleanup of system users / old groups - James
  • Layout - Nirdesh
    • Lo0 RAID (mdadm)
    • 10GB from Dali to lo0 (adding rules on compute node routing tables as a possible fix)
    • BIOS reset
  • 10Gb, perfsonar, ...
  • Monitoring: (Ganglia, Shinken)
    • Getting consistency among all the machines(check_nrpe regularly stops working).
  • Whedon: configured and available
  • Change passwords (on everything). Postgres, shenken, ...
  • Webcam on office whiteboard (new office location?)
  • Learn virtual machine architecture and modules - Dave
    • Document in a format for future admin training?
    • Find existing introduction material
  • Mirror control for testing, swapping, etc.

DONE (19 Jan 2017)

  • Examine extra "layout" node. - Adam
    • Differences are: Single PSU, Single GPGPU, No VGA.
    • It has Infiniband and 10GB cards installed.
  • Networking - Adam, Charlie
    • IP over Infiniband working on layout
      • Resolved by resetting IB switch configuration: ibwarn: [3349] mad_rpc_rmpp: _do_madrpc failed; dport (Lid 1)

FUTURE

  • Centralized password database / manager / location

Current Projects (updated 13 Oct 16)

  • Groups and LDAP and sudo - James
  • Amber - James
  • Edward's setup - Vitalli
  • WebDev access - Nirdesh
  • Puppet - James and Vitalii
  • Bacula - Nirdesh
  • SSL certificate upgrade and documentation - Kristin
  • Listserv merging with archives preserved - Nirdesh
  • Ganglia - Bret
  • Shenken - Vitalii
    • latency, UPS
  • New Layout node - ? and ?
  • Provision Sappho (compute) - after Puppet
  • Provision Kahlo (storage) -
    • replace broken drive
  • I2 setup
    • DTN, storage nodes, head nodes, ports in CST
  • Provision Whedon (compute) - after Puppet
  • Shutdown and startup test - scheduled for Sunday 27 November
  • Disk cleaning - Charlie
  • Password changing in the CS and cluster domains - Vitalii and James
  • Proto setup and maintenance with HIP/Green Science