Sysadmin:Random Notes (6/16)

From Earlham CS Department
Jump to navigation Jump to search

General notes from work done on June 16.

  1. Power cycle media converters one or two times after a power failure
  2. Where is wyse2?
  3. D224 closet needs to be cleaned and rewired.
  • setup for this?
  • schedule downtime?
  • best way to go about it?
    • labels!
    • cable ties
      • in admin office
  • ecs stuff
    • can we do what we want with it, or should we have rowan/kevin take a look at this with us?
  1. Lovelace
  • bge0 - external
  • bge1 - internal