Line 7: Line 7:
 
** Next week on roof
 
** Next week on roof
 
** Two weeks in field (2005-09-12)
 
** Two weeks in field (2005-09-12)
 +
* RP&L Weather data (Mary and Charlie)
  
 
Useful Support Documents from Davis Instruments:  
 
Useful Support Documents from Davis Instruments:  

Revision as of 14:50, 5 September 2005

To Do

Last updated 2005-09-05

  • Test analog and digital I/O on pmp (Alex, Tom)
  • Time synch on PMP (Alex, Tom)
  • Backup on PMP - needs a find wrapped around the tar to generate the file list (Alex, Tom)
  • Porting wind speed and direction software and setup (Mary)
    • Next week on roof
    • Two weeks in field (2005-09-12)
  • RP&L Weather data (Mary and Charlie)

Useful Support Documents from Davis Instruments:

Other local data that can easily be harvested: Farmland

Hardware:

  • PMP
    • Technologic Systems TS56000 single board computer running Linux off a SANDisk.
    • URL for the board and documentation
    • To Do
      • Port threaded anemometer code, change code to use local analog/digital inputs
      • Setup NFS mounting of / on the pmp from proto
      • Test analog and digital inputs
      • Setup and test WiFi interface
      • Test and document backup and recovery procedure
      • Identify and recover missing files from SANDisk
      • Design and implement data collection, sleep, and data transfer functions
  • Anemometer
    • The Wind direction sends an analogue number.
    • The wind speed is the number of pulses per 2.25 second interval. The number of pulses is the windspeed in MPH.
  • Rain guage:
    • Sends a pulse every time the cup switches.