Wind-farm

From Earlham CS Department
Revision as of 17:56, 23 September 2009 by Spwein06 (talk | contribs) (Project goals: To determine the feasibility of a utility scale wind farm being constructed in the fields back campus.)
Jump to navigation Jump to search

Project goals: To determine the feasibility of a utility scale wind farm being constructed in the fields back campus.

Progress:

  • I have talked with Arlene DeBlanc about possible government grants
  • I have analyzed data from RP&L's tall towers survey.
  • I have analyzed data from the Indiana Tall Towers Wind Survey
  • I have analyzed the data from the weather station on the roof of Dennis
  • I have contacted numerous manufacturers for price quotes and other information on possible turbines
  • I have investigated various funding sources

Turbine Possibilities

Feasibility requirements

  • Long blades (100M diameter+)
  • Tall tower (100M+ height)

Candidates

Nordex N100

Fuhrlaender FL-2500

RE Power 3.3 MW

Siemens SWT-101

Vestas V-112

Vestas V-100

GE-2.5xl


Grant research

USDA Guaranteed Loans

  • B&I guaranteed loans
  • Cover up to 10 Million $ (up to 40 in some cases)
  • Guarantee 60-70% of the loans against default

Rural Business Opportunity Grant

  • Up to 50,000$ for economic development
  • Deadline for this year has already passed

====EDA Public Works Grant

  • Average award of 9 Million $
  • Must show that project will help the local economy