DBI:minutes

From Earlham CS Department
Revision as of 07:19, 14 April 2009 by Johnsbe1 (talk | contribs) (2009 3 31)
Jump to navigation Jump to search

Current

2009.3.31

Attendees

Ben, Gus, Nate

Progress

  • Nate
* Has been working on the twiki site.
* Worked on the Midterm Progress Reporting Tool and determined that the issues reported were due to two different instructors submitting reports for the same course (due to lab assignments). We decided that the issues could be resolved by encouraging better communication between the instructors and informing the Registrars Office that they may need to edit such entries manually after posting has occurred.
* Looked into the suggestions for "serveOrphan.php" and decided that the "calling" PHP in "serveOrphan" just needs to be modified to call the regular functions (instead of the "orphaned" versions they are attempting to use now). That will eliminate the duplicated, out-of-date code and look better in the framed window from Luminis.
  • Gil and Gus
* Have obtained a copy of the current Questionnaire and started thinking about the underlying database design.

To-Dos

  • Nate
* E-mail Randy and Betsy about "grevegr" vs "greveke"
* E-mail to registrar explaining situations, options for leslie b and jessa w
* Revamp service; use normal versions of timesheet/comxodx/etc with a smarter service.php (to handle header, tabs, footer strip)
  • Gus
* Use lessons we went over to keep on keeping on with housing questionaire. Share notes with Gil. Have a little something for Thursday.

Archive

2009.3.24

Progress

  • Worked on schema design for their Questionnaire project.

To-Dos

  • Continue work on the design of the Questionnaire project and posting changes on the twiki.

2009 3 17

  • ...

2009 3 10

  • ...