Wind-farm
Jump to navigation
Jump to search
Contents
Project goals: To determine the feasibility of a utility scale wind farm being constructed in the fields back campus.
Progress:
- I have talked with Arlene DeBlanc about possible government grants
- I have analyzed data from RP&L's tall towers survey.
- I have analyzed data from the Indiana Tall Towers Wind Survey
- I have analyzed the data from the weather station on the roof of Dennis
- I have contacted numerous manufacturers for price quotes and other information on possible turbines
- I have investigated various funding sources
Turbine Possibilities
Feasibility requirements
- Long blades (100M diameter+)
- Tall tower (100M+ height)