Miller Farm: Difference between revisions

From Earlham CS Department
Jump to navigation Jump to search
Copelco (talk | contribs)
No edit summary
 
Copelco (talk | contribs)
No edit summary
 
Line 1: Line 1:
== Apr 24 ==


 
{| class="wikitable" border="1" width="50%"
 
|+ '''2 monitoring areas (220V, Single Phase)'''
2 monitoring areas:
| Green House || 40A || 2 110 Legs, 1 Neutra, 1 Ground
{|
| Green House || 40A ||
|-  
|-  
| Hot Water Heater || 20A ||
| Hot Water Heater || 20A ||
|}
|}
* Use '''Energy and Power LCD''' metering to check our work, which can be reprogrammed to suite different setups.
* '''TODO''' Take volt meter to Miller and check style of both installations.
* Torodial: Cheaper and more accurate at low current.

Latest revision as of 16:48, 24 April 2006

Apr 24

2 monitoring areas (220V, Single Phase)
Green House 40A 2 110 Legs, 1 Neutra, 1 Ground
Hot Water Heater 20A
  • Use Energy and Power LCD metering to check our work, which can be reprogrammed to suite different setups.
  • TODO Take volt meter to Miller and check style of both installations.
  • Torodial: Cheaper and more accurate at low current.