Difference between revisions of "Building monitoring"
Jump to navigation
Jump to search
m (→Buildings (with Status)) |
m (→Buildings (with Status)) |
||
Line 1: | Line 1: | ||
==Buildings (with Status)== | ==Buildings (with Status)== | ||
* Contact Daryl about Siemans (Tyler, Stanley, New Science) | * Contact Daryl about Siemans (Tyler, Stanley, New Science) | ||
− | |||
* Central Switch - IB, CP, GC | * Central Switch - IB, CP, GC | ||
* EH - (good luck) | * EH - (good luck) |
Revision as of 13:39, 8 June 2015
Buildings (with Status)
- Contact Daryl about Siemans (Tyler, Stanley, New Science)
- Central Switch - IB, CP, GC
- EH - (good luck)
- AWC - GC - (GC, 10-16-14, needs hooked up)
- Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
- Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
- New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)