Difference between revisions of "Wind-farm"
Jump to navigation
Jump to search
(→Progress:) |
|||
Line 13: | Line 13: | ||
- I have investigated various funding sources | - I have investigated various funding sources | ||
+ | |||
+ | === Turbine Possibilities === | ||
+ | ==== Feasibility requirements ==== | ||
+ | - Long blades (100M diameter+) | ||
+ | |||
+ | - Tall tower (100M+ height) | ||
+ | |||
+ | ==== Candidates ==== | ||
+ | |||
+ | [http://www.nordex-online.com/en/products-services/wind-turbines/n100-25-mw Nordex N100] | ||
+ | |||
+ | [http://www.fuhrlander.de/index.php?option=com_content&task=view&id=48&Itemid=72&lang=en Fuhrlaender FL-2500] | ||
+ | |||
+ | [http://www.repower.de/3XM/index.php?L=1 RE Power 3.3 MW] | ||
+ | |||
+ | [http://www.powergeneration.siemens.com/products-solutions-services/products-packages/wind-turbines/products/swt-2-3-101/ Siemens SWT-101] | ||
+ | |||
+ | [http://v112.vestas.com/ Vestas V-112] | ||
+ | |||
+ | [http://www.vestas.com/en/wind-power-solutions/wind-turbines/2.0-mw.aspx Vestas V-100] | ||
+ | |||
+ | [http://www.gepower.com/prod_serv/products/wind_turbines/en/2xmw/index.htm GE-2.5xl] |
Revision as of 17:12, 23 September 2009
Contents
Project goals: To determine the feasibility of a utility scale wind farm being constructed in the fields back campus.
Progress:
- I have talked with Arlene DeBlanc about possible government grants
- I have analyzed data from RP&L's tall towers survey.
- I have analyzed data from the Indiana Tall Towers Wind Survey
- I have analyzed the data from the weather station on the roof of Dennis
- I have contacted numerous manufacturers for price quotes and other information on possible turbines
- I have investigated various funding sources
Turbine Possibilities
Feasibility requirements
- Long blades (100M diameter+)
- Tall tower (100M+ height)