Difference between revisions of "Green Science"
Jump to navigation
Jump to search
Line 14: | Line 14: | ||
***Mic needs to find pictures of equipment and send to Andy | ***Mic needs to find pictures of equipment and send to Andy | ||
***Charlie needs to read basic green science document, find out what we planned for display cases and let Andy know | ***Charlie needs to read basic green science document, find out what we planned for display cases and let Andy know | ||
+ | *** http://www.usgbc.com - | ||
+ | *** Green walls, composite or bamboo table to match existing carpet and new wall color. | ||
+ | *** The Green Zone should be LEEDS certifiable, maybe silver or gold (not platinum). | ||
+ | *** Rolling, armless chairs with flexible backs. | ||
** Re-read the green zone document, start to plan various interactive displays (Alex and Mary) | ** Re-read the green zone document, start to plan various interactive displays (Alex and Mary) | ||
*** Power interface display cabinet | *** Power interface display cabinet |
Revision as of 12:03, 23 June 2005
- Meetings: Tuesdays at 1pm.
- Solar panel setup on roof of Dennis
- Expedite Bill Mullin's approval of mounting system on parapets
- Bill responded to the Dennis Hall 4th floor diagrams made by Mic and Mary last Thursday (20050616). He indicated that he would check 3rd floor structurals for wind tower. We need Geoff's drawings for parapet mount. If we have not heard by Friday (20050621), Mary needs to follow up.
- (Geoff Greenfield is frozen until we get this)
- Mic needs to call Geoff to follow up on Bill's document, and to request design for parapet mount.
- Mary to contact to see if he has everything he needs to approve --
- done, conversation started
- Expedite Bill Mullin's approval of mounting system on parapets
- Green Zone setup in the first floor lounge of Dennis
- Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
- met with Andy on Tuesday morning (20050621), and will meet again on Thursday at 10:30.
- Mic needs to find pictures of equipment and send to Andy
- Charlie needs to read basic green science document, find out what we planned for display cases and let Andy know
- http://www.usgbc.com -
- Green walls, composite or bamboo table to match existing carpet and new wall color.
- The Green Zone should be LEEDS certifiable, maybe silver or gold (not platinum).
- Rolling, armless chairs with flexible backs.
- Re-read the green zone document, start to plan various interactive displays (Alex and Mary)
- Power interface display cabinet
- Display wall
- Contact RP&L to learn about net metering
- Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
- Wind monitoring South of campus
- Maps
- Anemometer setup, first on roof of Dennis then in field, with Alex
- Charlie and Mary will go to area Wednesday (20050622)
- Analog signal, resistance or voltage? for speed and direction
- PMP hardware/software setup, with Alex
- The sample program for reading A/D ports doesn't work on our setup, Alex will contact tech support.
- Document PMP setup in a wiki (HIP/PMP Setup)
- Wind generator setup on roof of Dennis
- Need engineering design of tower/pole structure for generator
- Mary to contact to see if he has everything he needs to design
- Coordination with Indiana State Commerce
- Heather Rippey (emails are invalid), Program Manager, Energy Resources
- Indiana Dept of Commerce, One North Capitol, Suite 700
- Indianapolis, IN, 46204
- 317-232-8965, fax: 317-232-8995, Mic to call
- www.indianacommerce.com
- Big ?? -- Are the Alternative Power and Energy (APE) and Energy Education and Demonstration Grant Programs still operative?
- (20050621) We have unable to establish contact with the State.
- Weather Station
- Complete hardware setup and monitoring software (Alex and Mary)
- Create wiki (HIP/Weather Station Setup) with the details of the ETS and Davis station
- Cleanup and organize data, Mary has chart
- Complete web interface with tabular and graphic output
- When not occupied with pressing duties, Mary will work on become the team meteorologist.
- Complete hardware setup and monitoring software (Alex and Mary)
- Resources
- http://www.cs.earlham.edu/~charliep/green-science/overview.html - The plan, so to speak. This should be moved into a wiki page at some point so we can all update it easily.
- Press
- http://www.earlham.edu/publicaffairs/content/pressroom/archive/2005/june/050617s-energy.php - Earlham's write-up of the Green Science project.