Green Science: Difference between revisions

From Earlham CS Department
Jump to navigation Jump to search
Tammma (talk | contribs)
No edit summary
Charliep (talk | contribs)
No edit summary
Line 1: Line 1:
* Solar panel setup on roof of Dennis  
* Solar panel setup on roof of Dennis  
** Expedite Bill Mullin's approval of mounting system on parapets
** Expedite Bill Mullin's approval of mounting system on parapets
**(Geoff Greenfield is frozen until we get this)
** (Geoff Greenfield is frozen until we get this)
** Mary to contact to see if he has everything he needs to approve


* Green Zone setup in the first floor lounge of Dennis
* Green Zone setup in the first floor lounge of Dennis
** Contact Andy Chao and get whatever he has for a rendering of the first floor space
** Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
** Work with Mic and Charlie to organize power interface display cabinet
** Work with Mic and Charlie to organize power interface display cabinet
** Contact RP&L to learn about net metering
** Contact RP&L to learn about net metering
Line 16: Line 17:
** Measure beams, communicate with Bill Mullin
** Measure beams, communicate with Bill Mullin
** Need engineering design of tower/pole structure for generator
** Need engineering design of tower/pole structure for generator
** Mary to contact to see if he has everything he needs to design


* Coordination with Indiana State Commerce
* Coordination with Indiana State Commerce

Revision as of 14:20, 20 June 2005

  • Solar panel setup on roof of Dennis
    • Expedite Bill Mullin's approval of mounting system on parapets
    • (Geoff Greenfield is frozen until we get this)
    • Mary to contact to see if he has everything he needs to approve
  • Green Zone setup in the first floor lounge of Dennis
    • Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
    • Work with Mic and Charlie to organize power interface display cabinet
    • Contact RP&L to learn about net metering
  • Wind monitoring South of campus
    • Maps
    • Anemometer setup, first on roof of Dennis then in field, with Alex
    • PMP software setup, with Alex
  • Wind generator setup on roof of Dennis
    • Measure beams, communicate with Bill Mullin
    • Need engineering design of tower/pole structure for generator
    • Mary to contact to see if he has everything he needs to design
  • Coordination with Indiana State Commerce
    • Heather Rippey (emails are invalid), Program Manager, Energy Resources
    • Indiana Dept of Commerce, One North Capitol, Suite 700
    • Indianapolis, IN, 46204
    • 317-232-8965, fax: 317-232-8995
    • www.indianacommerce.com
    • Big ?? -- Are the Alternative Power and Energy (APE) and Energy Education and Demonstration Grant Programs still operative?
  • Weather Station
    • Cleanup and organize data
    • Complete web interface with tabular and graphic output
    • Complete hardware setup and monitoring software with Alex


  • Note, put a link to the online document here.