Science-Friday: Difference between revisions

From Earlham CS Department
Jump to navigation Jump to search
Charliep (talk | contribs)
No edit summary
Charliep (talk | contribs)
No edit summary
Line 1: Line 1:
The Keck Foundation Phase I proposal:
The Keck Foundation Phase I proposal:
*[[Phase 1 proposal prose]]  
*[[keck-phase-1-summary|Phase 1 prose, summary sections (1-5)]]
*[[keck-phase-1-description|Phase 1 prose, description sections (6-12)]]
*[[keck-phase-1-reviewers|Phase 1 reviewers]]
*[[keck-phase-1-budget|Phase 1 budget]] (This could be a link to an Excel spreadsheet)


*Things to do:
*Things to do:
**Review Doug's call notes with Mercedes.  07-Mar-2006 email from Barbara.   
**Review Doug's call notes with Mercedes.  07-Mar-2006 email from Barbara.   
**Check with potential reviewers
**Check with potential reviewers
**Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (link above).  Using two browser tabs, one with each of the documents in edit mode, is one way to do this.
**Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (links above).  Using two browser tabs, one with each of the documents in edit mode, is one way to do this.
**Review the Keck guidelines.  07-Apr-2006 email from Barbara.
**Review the Keck guidelines.  07-Apr-2006 email from Barbara.
**Develop the budget.  07-Apr-2006 email from Barbara.
**Develop the budget.  07-Apr-2006 email from Barbara.

Revision as of 14:18, 7 May 2006

The Keck Foundation Phase I proposal:

  • Things to do:
    • Review Doug's call notes with Mercedes. 07-Mar-2006 email from Barbara.
    • Check with potential reviewers
    • Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (links above). Using two browser tabs, one with each of the documents in edit mode, is one way to do this.
    • Review the Keck guidelines. 07-Apr-2006 email from Barbara.
    • Develop the budget. 07-Apr-2006 email from Barbara.
  • Open questions:
    • What counts as a matching contribution from EC? E.g. indirect, graphite furnace (Barbara)
  • Timetable:
    • 22-May-2006 - Phase I proposal due to DougB
    • 01-Aug-2006 - Notification from Keck, begin work on full proposal?
    • 01-Sep-2006 - Full prosposal due to Keck
    • 01-Dec-2006 - Notification from Keck

Documents from the Keck Foundation letter of inquiry (LOI):

Meeting minutes: