Difference between revisions of "Aaron-cs345-log"

From Earlham CS Department
Jump to navigation Jump to search
Line 23: Line 23:
 
4/13
 
4/13
 
   1 hour working on bug
 
   1 hour working on bug
 +
  1 hour working on my development environment

Revision as of 13:02, 13 April 2012

earlier

 2 hours trying to get eclipse and the android SDK working on Windows

up to 3/22

 4 hours getting virtual box up

3/23

 1.5 hours working on eclipse and the android SDK working

3/27

 .5 hours working on getting eclipse set up

3/29

 1 hour working on getting eclipse set up
 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program

3/30

 2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine

4/3

 2 hours trying to get my environment working correctly, still needs work
 about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how
   pictures are stored.
 about 20 minutes looking at tracker activity

4/10

 30 minutes updating posit on phone and adding finds.
 45 minutes working on bug
 10 minutes working with Sean on tracker activity

4/13

 1 hour working on bug
 1 hour working on my development environment