Difference between revisions of "HIP:YSI-650MDS"

From Earlham CS Department
Jump to navigation Jump to search
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
 +
[http://www.ierents.com/Manuals/YSI650.PDF 650 MDS Operation Manual]
 +
 
*How to connect sonde and GPS to 650.
 
*How to connect sonde and GPS to 650.
 
[[Image:Connect_650_with_sonde_gps.jpg]]
 
[[Image:Connect_650_with_sonde_gps.jpg]]
Line 7: Line 9:
 
*How to calibrate sonde using 650 unit?
 
*How to calibrate sonde using 650 unit?
 
**(Example of pH)
 
**(Example of pH)
**1. Connecting 650 to sonde, highlight Sonde menu -> Calibrate -> ISE1 pH -> 1-point
+
***1. Connecting 650 to sonde, highlight Sonde menu -> Calibrate -> ISE1 pH -> 1-point
**2. Immerse the sonde in a buffer of known pH value and press Enter
+
***2. Immerse the sonde in a buffer of known pH value and press Enter
**3. Input the proper pH value for your calibration temperature, and press Enter
+
***3. Input the proper pH value for your calibration temperature, and press Enter
 +
**(Example of conductivity)
 +
***1. Highlight sonde menu -> Conductivity -> SpCond
 +
***2. Enther the value of the standard used during calibration
 +
***3. Confirm the calibration
 +
**(Example of Dissolved Oxygen)
 +
***1. Place the sonde in the calibration chamber with the dissolved oxygen probe in water-saturated air
 +
***2. Highlight Sonde menu -> Calibration -> Dissolved Oxygen -> DO%
 +
***3. Enter the current local barometric pressure
 +
***4. Observe the dissolved oxygen reading until stabilization occurs, and confirm
 +
**(Example of ORP)
 +
***1. Highlight Sonde menu -> Calibration -> ISE2 ORP
 +
***2. Immerse the sonde in a solution with a known oxidation reduction potential value
 +
***3. You will be prompted to enter the ORP value of the solution
 +
***4. After stabilization, press Enter to confirm the calibration
  
 
*How to harvest data?
 
*How to harvest data?
Line 33: Line 49:
 
****[http://2.bp.blogspot.com/_3kd0zP9TXws/SLbTS6xSCYI/AAAAAAAAAWM/7zWCW-x6CGY/s1600-h/Step+4.bmp Select parameter]
 
****[http://2.bp.blogspot.com/_3kd0zP9TXws/SLbTS6xSCYI/AAAAAAAAAWM/7zWCW-x6CGY/s1600-h/Step+4.bmp Select parameter]
 
****[http://2.bp.blogspot.com/_3kd0zP9TXws/SLbTTNopQFI/AAAAAAAAAWU/fl37zXV8DeQ/s1600-h/Step+5.bmp Display data]
 
****[http://2.bp.blogspot.com/_3kd0zP9TXws/SLbTTNopQFI/AAAAAAAAAWU/fl37zXV8DeQ/s1600-h/Step+5.bmp Display data]
**3. Choose File->Export->CDF/WMF
+
**3. Choose File -> Export -> CDF/WMF
 +
 
 +
==YSI650 Case==
 +
[[Image:ysi650_box.jpg]]<br>
 +
[[Image:ysi650_inventory.jpg]]<br>
 +
(1) Sonde
 +
(2) YSI650
 +
(3) GPS
 +
(4) PC Interface Cable
 +
(5) Field Cable
 +
(6) DE-9 to GPS Cable
 +
(7) 6115 GPS Cable

Latest revision as of 21:17, 26 May 2010

650 MDS Operation Manual

  • How to connect sonde and GPS to 650.

Connect 650 with sonde gps.jpg

    • To communicate with GPS:
      • 1. In GPS menu, highlight SETUP -> INTERFACE
      • 2. Set I/O FORMAT: NMEA OUT
  • How to calibrate sonde using 650 unit?
    • (Example of pH)
      • 1. Connecting 650 to sonde, highlight Sonde menu -> Calibrate -> ISE1 pH -> 1-point
      • 2. Immerse the sonde in a buffer of known pH value and press Enter
      • 3. Input the proper pH value for your calibration temperature, and press Enter
    • (Example of conductivity)
      • 1. Highlight sonde menu -> Conductivity -> SpCond
      • 2. Enther the value of the standard used during calibration
      • 3. Confirm the calibration
    • (Example of Dissolved Oxygen)
      • 1. Place the sonde in the calibration chamber with the dissolved oxygen probe in water-saturated air
      • 2. Highlight Sonde menu -> Calibration -> Dissolved Oxygen -> DO%
      • 3. Enter the current local barometric pressure
      • 4. Observe the dissolved oxygen reading until stabilization occurs, and confirm
    • (Example of ORP)
      • 1. Highlight Sonde menu -> Calibration -> ISE2 ORP
      • 2. Immerse the sonde in a solution with a known oxidation reduction potential value
      • 3. You will be prompted to enter the ORP value of the solution
      • 4. After stabilization, press Enter to confirm the calibration
  • How to harvest data?
    • Run sonde from 650.
      • 1. In 650 main menu, highlight Sonde run -> (under 650) start logging
      • 2. Enter a file name and site description
      • 3. 650 starts logging
      • 4. When the study is complete, highlight the Stop logging selection and press Enter
      • NOTE: You have to log the data to 650 memory, not to sonde memory, because GPS and barometer data cannot be logged to sonde memory.
  • How to update data on PC?
    • 1. Connect 650 to stewie in HIP account.
    • 2. Run EcoWatch, click on the sonde icon in the upper tool bar, and set the Comm port number to match your interface.
    • 3. Highlight the Upload to PC selection in the 650 File menu and press Enter to view a list of the files. Highlight the file that you wish to transfer and press Enter.

Upload data on PC.jpg

YSI650 Case

Ysi650 box.jpg
Ysi650 inventory.jpg
(1) Sonde (2) YSI650 (3) GPS (4) PC Interface Cable (5) Field Cable (6) DE-9 to GPS Cable (7) 6115 GPS Cable