Keck-phase-1-budget: Difference between revisions

From Earlham CS Department
Jump to navigation Jump to search
Charliep (talk | contribs)
No edit summary
Charliep (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Add money for conferences to present work  
Add money for conferences to present work  


What about money for dissemination?  Science pedagogy conferences.
What about money for dissemination?  Science pedagogy conferences.
What about money for an external evaluator?  Build it in from the start.
What about money for an external evaluator?  Build it in from the start.
Student conference travel and registration
 
                                  2007      2008      2009      Total
PERSONNEL             
  Faculty Stipends           
    Summer research (@$600/wk) $28,800    $28,800    $28,800    $86,400
    Project Coordinator        $3,000    $3,000    $3,000    $9,000
  Student Stipends               
    Summer research (@$400/wk) $38,400    $38,400    $38,400  $115,200
 
TOTAL PERSONNEL                                                $210,600
               
EQUIPMENT             
  Ultrasonic Nebulizer        $15,000           
  Large freeze drier          $25,000           
  Acid digestion system        $25,000
  Differential GPS add-on    $1,500         
 
  Field Monitoring (4@$3000 each):             
    Temperature, pH (digital), conductivity, redox (reduction oxidation
    potential), pressure transducer, nitrate selective probe, computer,
    packaging, and communications 
  Total Field Monitoring      $12,000           
 
  Field Sampling:                     
    Lake sediment cores to 2 m             
    Shelby soil cores             
    Monitoring wells (one time install)
    Drawing equipment             
  Total Field Sampling        $15,000
 
  Biology sampling gear        $3,800
 
TOTAL EQUIPMENT                                                  $
               
SUPPLIES                 
TOTAL SUPPLIES                $12,000  $12,000    $12,000      $36,000
               
GRAND TOTAL                                                    $342,400

Latest revision as of 17:42, 12 May 2006

Add money for conferences to present work

What about money for dissemination?  Science pedagogy conferences.
What about money for an external evaluator?  Build it in from the start.
Student conference travel and registration
                                 2007       2008       2009      Total

PERSONNEL

 Faculty Stipends             
   Summer research (@$600/wk) $28,800    $28,800    $28,800    $86,400 
   Project Coordinator         $3,000     $3,000     $3,000     $9,000 
 Student Stipends                
   Summer research (@$400/wk) $38,400    $38,400    $38,400   $115,200 

TOTAL PERSONNEL $210,600

EQUIPMENT

 Ultrasonic Nebulizer         $15,000            
 Large freeze drier           $25,000            
 Acid digestion system        $25,000 
 Differential GPS add-on    $1,500          
 
 Field Monitoring (4@$3000 each):              
   Temperature, pH (digital), conductivity, redox (reduction oxidation 
   potential), pressure transducer, nitrate selective probe, computer, 
   packaging, and communications  
 Total Field Monitoring       $12,000            
 Field Sampling:                      
   Lake sediment cores to 2 m              
   Shelby soil cores               
   Monitoring wells (one time install)
   Drawing equipment              
 Total Field Sampling         $15,000
 
 Biology sampling gear         $3,800

TOTAL EQUIPMENT $

SUPPLIES TOTAL SUPPLIES $12,000 $12,000 $12,000 $36,000

GRAND TOTAL $342,400