Difference between revisions of "Building monitoring"

From Earlham CS Department
Jump to navigation Jump to search
(Buildings)
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
==Buildings (with Status)==
+
==General==
** Contact Daryl about Siemans (Tyler, Stanley, New Science)
+
* [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
** [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
+
 
** Central Switch - IB, CP, GC
+
==Buildings==
** EH - (good luck)
+
* Contact Daryl about Siemans (Tyler, Stanley, CST)
** AWC - GC - (GC, 10-16-14, needs hooked up)
+
* Central Switch - IB, CP, GC
** Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
+
* EH - (good luck)
** Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
+
* AWC - GC - (GC, 10-16-14, needs hooked up)
** New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
+
* Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
 +
* Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
 +
* New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
  
 
==EGX100==
 
==EGX100==
Line 19: Line 21:
  
 
[[Sepam Series 20]]
 
[[Sepam Series 20]]
 +
 +
[[Category:export]]

Latest revision as of 13:54, 4 January 2017

General

Buildings

  • Contact Daryl about Siemans (Tyler, Stanley, CST)
  • Central Switch - IB, CP, GC
  • EH - (good luck)
  • AWC - GC - (GC, 10-16-14, needs hooked up)
  • Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
  • Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
  • New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)

EGX100

Energy Monitoring Hardware

Siemens

Siemens Sentron Pac3200

PowerLogic

PowerLogic PM800

Sepam Series 20