==Displaying Energy Scripts Outline==
+
==General==
#Java scripts harvest data directly from Modbus
+
* [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
#Perl scripts collects this data and put it in the Postgress database "energy" under the table "electrical_energy"
 
#*electrical_energy attributes:
 
#**area - what building.
 
#**preal - kW hours for that instant.
 
#**date - date of harvest.
 
#A final perl script (display/production|development/js-file-gen.pl) accesses this data and generates a .png graph using the Google graph API
 
#* This script takes one parameter for either the production or development branches.
 
#The images generated (day, week, month, year) are put in a html frame on a [http://proto.cs.earlham.edu/~energy/production/eDisplay/ page] to display the data.
 
#*This page refreshes every 5 minutes
 
  
==Building EGX100 IPs==
+
==Buildings==
*159.28.165.<strong>100</strong> - Bundy
+
* Contact Daryl about Siemans (Tyler, Stanley, CST)
*159.28.165.<strong>101</strong> - Barrett
+
* Central Switch - IB, CP, GC
*159.28.165.<strong>102</strong> - Wilson
+
* EH - (good luck)
*159.28.165.<strong>103</strong> - Warren
+
* AWC - GC - (GC, 10-16-14, needs hooked up)
*159.28.165.<strong>104</strong> - Mills*
+
* Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
*159.28.165.<strong>105</strong> - Olvey Andis*
+
* Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
*159.28.165.<strong>?</strong> - Main switch gear (PM8)
+
* New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
: * - CT magnets are not installed yet, no EGX100 on network, etc.
 
  
==Building Amperage Correction Factors==
+
==EGX100==
*Bundy - 31.25
+
[[Energy Monitoring Hardware]]
*Barrett - 15.625
 
*Wilson - 62.5
 
*Warren - 62.5
 
*Mills* - ?
 
*Olvey Andis* - ?
 
:Source: load the schneider doc, amps, reference page
 
  
==Documentation==
+
==Siemens==
* [[pm8-mib|MIB for the PM8]] (device mounted on the main switchgear)
+
[[Siemens Sentron Pac3200]]
* [[Media:enercept-registers.pdf|Register list]] for the Enercept/EGX100s (devices mounted in each of the buildings)
+
 
 +
==PowerLogic==
 +
[[PowerLogic PM800]]
 +
 
 +
[[Sepam Series 20]]
 +
 
 +
[[Category:export]]

Latest revision as of 13:54, 4 January 2017

General

Buildings

  • Contact Daryl about Siemans (Tyler, Stanley, CST)
  • Central Switch - IB, CP, GC
  • EH - (good luck)
  • AWC - GC - (GC, 10-16-14, needs hooked up)
  • Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
  • Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
  • New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)

EGX100

Energy Monitoring Hardware

Siemens

Siemens Sentron Pac3200

PowerLogic

PowerLogic PM800

Sepam Series 20