Difference between revisions of "Building monitoring"

From Earlham CS Department
Jump to navigation Jump to search
(Buildings)
 
(196 intermediate revisions by 8 users not shown)
Line 1: Line 1:
==Scripts==
+
==General==
#Java scripts harvest data directly from Modbus
+
* [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
#Perl scripts collect this data and put it in the Postgress database "energy" under the table 'electrical_energy'
 
**electrical energy
 
***area - what building.
 
***preal - kW hours for that instant.
 
***date - date of harvest.
 
#A final perl script accesses this data and generates a .png graph using the Google graph API
 
#The images generated (day, week, month, year) are put in a html frame on a [http://proto.cs.earlham.edu/~energy/production/eDisplay/ page] to display the data.
 
  
==Building IP==
+
==Buildings==
*159.28.165.<strong>100</strong> - Bundy*
+
* Contact Daryl about Siemans (Tyler, Stanley, CST)
*159.28.165.<strong>101</strong> - Barrett
+
* Central Switch - IB, CP, GC
*159.28.165.<strong>102</strong> - Wilson
+
* EH - (good luck)
*159.28.165.<strong>103</strong> - Warren
+
* AWC - GC - (GC, 10-16-14, needs hooked up)
*159.28.165.<strong>104</strong> - Unknown
+
* Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
*159.28.165.<strong>105</strong> - Unknown
+
* Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
: * - not yet set up
+
* New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
 +
 
 +
==EGX100==
 +
[[Energy Monitoring Hardware]]
 +
 
 +
==Siemens==
 +
[[Siemens Sentron Pac3200]]
 +
 
 +
==PowerLogic==
 +
[[PowerLogic PM800]]
 +
 
 +
[[Sepam Series 20]]
 +
 
 +
[[Category:export]]

Latest revision as of 13:54, 4 January 2017

General

Buildings

  • Contact Daryl about Siemans (Tyler, Stanley, CST)
  • Central Switch - IB, CP, GC
  • EH - (good luck)
  • AWC - GC - (GC, 10-16-14, needs hooked up)
  • Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
  • Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
  • New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)

EGX100

Energy Monitoring Hardware

Siemens

Siemens Sentron Pac3200

PowerLogic

PowerLogic PM800

Sepam Series 20