Difference between revisions of "DBI:minutes"
Jump to navigation
Jump to search
(→Nate) |
(→Current) |
||
Line 22: | Line 22: | ||
* Continue working on documenting the "Countdown Survey" project. | * Continue working on documenting the "Countdown Survey" project. | ||
* Help Nate with the "serveOrphan.php" code and checkout SVN repositories to play with. | * Help Nate with the "serveOrphan.php" code and checkout SVN repositories to play with. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
= Archive = | = Archive = |
Revision as of 07:27, 14 April 2009
Contents
Current
2009.04.07
Attendees
Ben, Gus, Gil, Nate
Progress
Nate
- Talked to Bonita and Julie about latency issues when changes are made to WebDB. Julie suggested that we have the "load_from_banner.pl" script run more often (possibly several times a day) to resolve these issues; but we did not think that would be necessary. If changes are being made directly inside WebDB, the load from Banner would not fix this. And since WebDB will no longer be used for online registrations, we may not notice the latencies in the future.
- Worked with Gus and Gil to do a little PHP/Perl/SVN training.
Gil and Gus
- Continued to study the WebDB technologies.
- Worked on documenting the design for the "Countdown Survey" project's database.
To-Dos
Nate
- Work on the "serveOrphan.php" with Gil and Gus.
- Contact Betsy and Randy about fixing Kevin's records in Banner (to match his LDAP username).
Gil and Gus
- Continue working on documenting the "Countdown Survey" project.
- Help Nate with the "serveOrphan.php" code and checkout SVN repositories to play with.
Archive
2009.3.24
Progress
- Worked on schema design for their Questionnaire project.
To-Dos
- Continue work on the design of the Questionnaire project and posting changes on the twiki.
2009 3 17
- ...
2009 3 10
- ...