Miller Farm: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Apr 24 == | |||
{| class="wikitable" border="1" width="50%" | |||
|+ '''2 monitoring areas (220V, Single Phase)''' | |||
2 monitoring areas | | Green House || 40A || 2 110 Legs, 1 Neutra, 1 Ground | ||
| Green House || 40A || | |||
|- | |- | ||
| Hot Water Heater || 20A || | | Hot Water Heater || 20A || | ||
|} | |} | ||
* Use '''Energy and Power LCD''' metering to check our work, which can be reprogrammed to suite different setups. | |||
* '''TODO''' Take volt meter to Miller and check style of both installations. | |||
* Torodial: Cheaper and more accurate at low current. | |||
Latest revision as of 16:48, 24 April 2006
Apr 24
| Green House | 40A | 2 110 Legs, 1 Neutra, 1 Ground |
| Hot Water Heater | 20A |
- Use Energy and Power LCD metering to check our work, which can be reprogrammed to suite different setups.
- TODO Take volt meter to Miller and check style of both installations.
- Torodial: Cheaper and more accurate at low current.