Line 5: | Line 5: | ||
** (Geoff Greenfield is frozen until we get this) | ** (Geoff Greenfield is frozen until we get this) | ||
** Mary to contact to see if he has everything he needs to approve | ** Mary to contact to see if he has everything he needs to approve | ||
+ | |||
* Green Zone setup in the first floor lounge of Dennis | * Green Zone setup in the first floor lounge of Dennis | ||
** Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address. | ** Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address. | ||
+ | ***met with Andy on Tuesday morning, and will meet again on Thursday at 10:30. | ||
+ | ***Mic needs to find pictures of equipment and send to Andy | ||
+ | ***Charlie needs to read basic green science document, find out what we planned for display cases and let Andy know | ||
+ | |||
** Re-read the green zone document, start to plan various interactive displays (Alex and Mary) | ** Re-read the green zone document, start to plan various interactive displays (Alex and Mary) | ||
*** Power interface display cabinet | *** Power interface display cabinet | ||
*** Display wall | *** Display wall | ||
** Contact RP&L to learn about net metering | ** Contact RP&L to learn about net metering | ||
+ | |||
* Wind monitoring South of campus | * Wind monitoring South of campus |
Revision as of 13:48, 21 June 2005
- Meetings: Tuesdays at 1pm.
- Solar panel setup on roof of Dennis
- Expedite Bill Mullin's approval of mounting system on parapets
- (Geoff Greenfield is frozen until we get this)
- Mary to contact to see if he has everything he needs to approve
- Green Zone setup in the first floor lounge of Dennis
- Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
- met with Andy on Tuesday morning, and will meet again on Thursday at 10:30.
- Mic needs to find pictures of equipment and send to Andy
- Charlie needs to read basic green science document, find out what we planned for display cases and let Andy know
- Contact Andy Chao and get whatever he has for a rendering of the first floor space, Mary to find phone/physical address.
- Re-read the green zone document, start to plan various interactive displays (Alex and Mary)
- Power interface display cabinet
- Display wall
- Contact RP&L to learn about net metering
- Re-read the green zone document, start to plan various interactive displays (Alex and Mary)
- Wind monitoring South of campus
- Maps
- Anemometer setup, first on roof of Dennis then in field, with Alex
- Analog signal, resistance or voltage? for speed and direction
- PMP hardware/software setup, with Alex
- The sample program for reading A/D ports doesn't work on our setup, Alex will contact tech support.
- Document PMP setup in a wiki (HIP/PMP Setup)
- Wind generator setup on roof of Dennis
- Need engineering design of tower/pole structure for generator
- Mary to contact to see if he has everything he needs to design
- Coordination with Indiana State Commerce
- Heather Rippey (emails are invalid), Program Manager, Energy Resources
- Indiana Dept of Commerce, One North Capitol, Suite 700
- Indianapolis, IN, 46204
- 317-232-8965, fax: 317-232-8995, Mic to call
- www.indianacommerce.com
- Big ?? -- Are the Alternative Power and Energy (APE) and Energy Education and Demonstration Grant Programs still operative?
- Weather Station
- Complete hardware setup and monitoring software (Alex and Mary)
- Create wiki (HIP/Weather Station Setup) with the details of the ETS and Davis station
- Cleanup and organize data, Mary has chart
- Complete web interface with tabular and graphic output
- Complete hardware setup and monitoring software (Alex and Mary)