Difference between revisions of "Science-Friday"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
The Keck Foundation Phase I proposal: | The Keck Foundation Phase I proposal: | ||
− | *[[Phase 1 | + | *[[keck-phase-1-summary|Phase 1 prose, summary sections (1-5)]] |
+ | *[[keck-phase-1-description|Phase 1 prose, description sections (6-12)]] | ||
+ | *[[keck-phase-1-reviewers|Phase 1 reviewers]] | ||
+ | *[[keck-phase-1-budget|Phase 1 budget]] (This could be a link to an Excel spreadsheet) | ||
*Things to do: | *Things to do: | ||
**Review Doug's call notes with Mercedes. 07-Mar-2006 email from Barbara. | **Review Doug's call notes with Mercedes. 07-Mar-2006 email from Barbara. | ||
**Check with potential reviewers | **Check with potential reviewers | ||
− | **Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose ( | + | **Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (links above). Using two browser tabs, one with each of the documents in edit mode, is one way to do this. |
**Review the Keck guidelines. 07-Apr-2006 email from Barbara. | **Review the Keck guidelines. 07-Apr-2006 email from Barbara. | ||
**Develop the budget. 07-Apr-2006 email from Barbara. | **Develop the budget. 07-Apr-2006 email from Barbara. |
Revision as of 09:18, 7 May 2006
The Keck Foundation Phase I proposal:
- Phase 1 prose, summary sections (1-5)
- Phase 1 prose, description sections (6-12)
- Phase 1 reviewers
- Phase 1 budget (This could be a link to an Excel spreadsheet)
- Things to do:
- Review Doug's call notes with Mercedes. 07-Mar-2006 email from Barbara.
- Check with potential reviewers
- Copy/paste/edit from the LOI prose (link below) into each section of the Phase I prose (links above). Using two browser tabs, one with each of the documents in edit mode, is one way to do this.
- Review the Keck guidelines. 07-Apr-2006 email from Barbara.
- Develop the budget. 07-Apr-2006 email from Barbara.
- Open questions:
- What counts as a matching contribution from EC? E.g. indirect, graphite furnace (Barbara)
- Timetable:
- 22-May-2006 - Phase I proposal due to DougB
- 01-Aug-2006 - Notification from Keck, begin work on full proposal?
- 01-Sep-2006 - Full prosposal due to Keck
- 01-Dec-2006 - Notification from Keck
Documents from the Keck Foundation letter of inquiry (LOI):
- Media:Summer_letter_06.doc Summer research cover letter 2006
- Media:summer_research_06.xls Summer research spreadsheet 2006
Meeting minutes:
- 2005-11-18
- 2005-11-11
- 2005-11-04
- 2005-10-28
- 2005-10-21 (not here yet)
- 2005-10-14 (not here yet)
- 2005-10-07
- 2005-09-30
- 2005-09-23
- 2005-09-16