== | ==General== | ||
* [[Energy Monitoring Hardware|Equipment Details]] (keep current!) | * [[Energy Monitoring Hardware|Equipment Details]] (keep current!) | ||
==Buildings== | |||
* Contact Daryl about Siemans (Tyler, Stanley, CST) | |||
* Central Switch - IB, CP, GC | * Central Switch - IB, CP, GC | ||
* EH - (good luck) | * EH - (good luck) | ||
| Line 19: | Line 21: | ||
[[Sepam Series 20]] | [[Sepam Series 20]] | ||
[[Category:export]] | |||
Latest revision as of 18:54, 4 January 2017
General
- Equipment Details (keep current!)
Buildings
- Contact Daryl about Siemans (Tyler, Stanley, CST)
- Central Switch - IB, CP, GC
- EH - (good luck)
- AWC - GC - (GC, 10-16-14, needs hooked up)
- Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
- Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
- New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)