Aaron-cs345-log: Difference between revisions
Jump to navigation
Jump to search
Aashaver10 (talk | contribs) No edit summary |
Aashaver10 (talk | contribs) No edit summary |
||
| (10 intermediate revisions by the same user not shown) | |||
| Line 11: | Line 11: | ||
1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program | 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program | ||
3/30 | 3/30 | ||
2 hours | 2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine | ||
4/3 | |||
2 hours trying to get my environment working correctly, still needs work | |||
about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how | |||
pictures are stored. | |||
about 20 minutes looking at tracker activity | |||
4/10 | |||
30 minutes updating posit on phone and adding finds. | |||
45 minutes working on bug | |||
10 minutes working with Sean on tracker activity | |||
4/13 | |||
1 hour working on bug | |||
1 hour working on my development environment | |||
4/17 | |||
2.5 hours with Sean's help have posit working on my laptop | |||
1 hour working on activity logging | |||
4/19 | |||
1.5 hours working with logging. We think we have a usable | |||
4/23 | |||
1.5 hours working with Tristan on bugs | |||
Latest revision as of 15:40, 24 April 2012
earlier
2 hours trying to get eclipse and the android SDK working on Windows
up to 3/22
4 hours getting virtual box up
3/23
1.5 hours working on eclipse and the android SDK working
3/27
.5 hours working on getting eclipse set up
3/29
1 hour working on getting eclipse set up 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program
3/30
2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine
4/3
2 hours trying to get my environment working correctly, still needs work about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how pictures are stored. about 20 minutes looking at tracker activity
4/10
30 minutes updating posit on phone and adding finds. 45 minutes working on bug 10 minutes working with Sean on tracker activity
4/13
1 hour working on bug 1 hour working on my development environment
4/17
2.5 hours with Sean's help have posit working on my laptop 1 hour working on activity logging
4/19
1.5 hours working with logging. We think we have a usable
4/23
1.5 hours working with Tristan on bugs