Difference between revisions of "Aaron-cs345-log"
Jump to navigation
Jump to search
Aashaver10 (talk | contribs) (Created page with "earlier 2 hours trying to get eclipse and the android SDK working on Windows up to 3/22 4 hours getting virtual box up 3/23 1.5 hours working on eclipse and the android SDK...") |
Aashaver10 (talk | contribs) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
3/23 | 3/23 | ||
1.5 hours working on eclipse and the android SDK working | 1.5 hours working on eclipse and the android SDK working | ||
+ | 3/27 | ||
+ | .5 hours working on getting eclipse set up | ||
+ | 3/29 | ||
+ | 1 hour working on getting eclipse set up | ||
+ | 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program | ||
+ | 3/30 | ||
+ | 2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine | ||
+ | 4/3 | ||
+ | 2 hours trying to get my environment working correctly, still needs work | ||
+ | about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how | ||
+ | pictures are stored. | ||
+ | about 20 minutes looking at tracker activity | ||
+ | 4/10 | ||
+ | 30 minutes updating posit on phone and adding finds. | ||
+ | 45 minutes working on bug | ||
+ | 10 minutes working with Sean on tracker activity | ||
+ | 4/13 | ||
+ | 1 hour working on bug | ||
+ | 1 hour working on my development environment | ||
+ | 4/17 | ||
+ | 2.5 hours with Sean's help have posit working on my laptop | ||
+ | 1 hour working on activity logging | ||
+ | 4/19 | ||
+ | 1.5 hours working with logging. We think we have a usable | ||
+ | 4/23 | ||
+ | 1.5 hours working with Tristan on bugs |
Latest revision as of 10:40, 24 April 2012
earlier
2 hours trying to get eclipse and the android SDK working on Windows
up to 3/22
4 hours getting virtual box up
3/23
1.5 hours working on eclipse and the android SDK working
3/27
.5 hours working on getting eclipse set up
3/29
1 hour working on getting eclipse set up 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program
3/30
2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine
4/3
2 hours trying to get my environment working correctly, still needs work about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how pictures are stored. about 20 minutes looking at tracker activity
4/10
30 minutes updating posit on phone and adding finds. 45 minutes working on bug 10 minutes working with Sean on tracker activity
4/13
1 hour working on bug 1 hour working on my development environment
4/17
2.5 hours with Sean's help have posit working on my laptop 1 hour working on activity logging
4/19
1.5 hours working with logging. We think we have a usable
4/23
1.5 hours working with Tristan on bugs