Difference between revisions of "Building monitoring"

From Earlham CS Department
Jump to navigation Jump to search
(PowerLogic)
Line 1: Line 1:
 +
==Buildings (with Status)==
 +
** Contact Daryl about Siemans (Tyler, Stanley, New Science)
 +
** [[Energy Monitoring Hardware|Equipment Details]] (keep current!)
 +
** Central Switch - IB, CP, GC
 +
** EH - (good luck)
 +
** AWC - GC - (GC, 10-16-14, needs hooked up)
 +
** Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
 +
** Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
 +
** New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)
 +
 
==EGX100==
 
==EGX100==
 
[[Energy Monitoring Hardware]]
 
[[Energy Monitoring Hardware]]

Revision as of 13:04, 8 June 2015

Buildings (with Status)

    • Contact Daryl about Siemans (Tyler, Stanley, New Science)
    • Equipment Details (keep current!)
    • Central Switch - IB, CP, GC
    • EH - (good luck)
    • AWC - GC - (GC, 10-16-14, needs hooked up)
    • Tyler - GC - (GC, 10-16-14, Steve Belec said that he will be receiving a walk-through from the contractors)
    • Stanley - GC - (GC, 10-16-14, need direct access for configuration over powerconfig)
    • New Building - GC - (GC, 1-23-14, waiting for Siemens system designers to get here to hopefully explain Tyler, Stanley and the new building)

EGX100

Energy Monitoring Hardware

Siemens

Siemens Sentron Pac3200

PowerLogic

PowerLogic PM800

Sepam Series 20