Difference between revisions of "Aaron-cs345-log"

From Earlham CS Department
Jump to navigation Jump to search
Line 14: Line 14:
 
4/3
 
4/3
 
   2 hours trying to get my environment working correctly, still needs work
 
   2 hours trying to get my environment working correctly, still needs work
   about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how pictures are stored.
+
   about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how
 +
    pictures are stored.
 +
  about 20 minutes looking at tracker activity

Revision as of 13:25, 6 April 2012

earlier

 2 hours trying to get eclipse and the android SDK working on Windows

up to 3/22

 4 hours getting virtual box up

3/23

 1.5 hours working on eclipse and the android SDK working

3/27

 .5 hours working on getting eclipse set up

3/29

 1 hour working on getting eclipse set up
 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program

3/30

 2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine

4/3

 2 hours trying to get my environment working correctly, still needs work
 about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how
   pictures are stored.
 about 20 minutes looking at tracker activity