Difference between revisions of "Aaron-cs345-log"

From Earlham CS Department
Jump to navigation Jump to search
Line 11: Line 11:
 
   1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program
 
   1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program
 
3/30
 
3/30
   2 hours, have eclipse and the android sdk installed working on increasing the size of my virtual machine
+
   2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine
 +
4/3
 +
  2 hours trying to get my environment working correctly, still needs work
 +
  about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how pictures are stored.

Revision as of 12:19, 6 April 2012

earlier

 2 hours trying to get eclipse and the android SDK working on Windows

up to 3/22

 4 hours getting virtual box up

3/23

 1.5 hours working on eclipse and the android SDK working

3/27

 .5 hours working on getting eclipse set up

3/29

 1 hour working on getting eclipse set up
 1 hour working on bug with Tristan should be fixed but we still need to track the effect those changes will have at other levels of the program

3/30

 2 hours have eclipse and the android sdk installed working on increasing the size of my virtual machine

4/3

 2 hours trying to get my environment working correctly, still needs work
 about 2 hours working on bug 232 with Tristan. We have a better check for data but need to figure out how pictures are stored.